How to use scaffolding fasteners
Release time:
2021-08-27 16:48
source:
In the construction industry, the pipe fasteners of construction scaffolding are often used in combination with scaffolding, playing a role in connecting steel pipes and stabilizing support, and are indispensable products in the construction industry. There are some technical requirements for the use of scaffolding fasteners in construction.
1. Appearance quality requirements for scaffolding fasteners. The appearance quality of fasteners is often inspected. If there are cracks, deformations, or bolt sliding buttons, they are prohibited from use. To prevent construction problems and accidents caused by the use of these unqualified fasteners.
2. Before the construction of scaffold fastener type steel pipe formwork support, prepare a construction plan and formulate a strict and detailed construction plan. If the plan is not done well, unexpected things may occur during the construction process.
3. Regarding the bearing capacity of scaffolding fasteners, the construction load of the operating layer should meet the planning requirements and should not be overloaded. Scaffolds should not be connected to template brackets, but they should be treated during connection to ensure the reasonable bearing capacity of the fasteners.
4. The steel pipes and fasteners used for the installation of fastener type template brackets should be sampled and tested before use. The quality and appearance of the steel pipes and fasteners should be sampled and tested to see if they meet the standards. The sampling quantity shall be executed in accordance with relevant regulations, and the sampling inspection shall be carried out in pieces. Unqualified products shall not be used.
Although steel pipe scaffold fasteners have certain reusability, the method to ensure the service life of the fasteners is maintenance and economy. Only in this way can the service life be extended, the engineering quality be guaranteed, and some maintenance costs and the cost of purchasing new fasteners be saved, killing two birds with one stone.
Nuts, screws, washers, bolts, and other small accessories. It is easy to lose fasteners installed on construction scaffolding. When supporting, the excess parts should be promptly recycled and stored. When dismantling, they should be inspected in a timely manner and should not be placed indiscriminately. Any damaged parts cannot be reused.
Establish a sound system for the receipt, recycling, self inspection, and maintenance of scaffold fastener tool materials. According to the principle of "whoever uses, maintains, and manages", losses are increased through quota collection or leasing.
All bent and deformed steel bars should be straightened first, and damaged components should be repaired before being stored in the warehouse; Otherwise, they should be changed. Remember to keep the storage area dry and ventilated, and try not to let the steel fasteners come into direct contact with the ground to avoid rusting.
Fasteners should undergo regular rust removal and rust prevention. Areas with high humidity (above 75%) should be coated with anti rust paint once a year, usually once every two years. Scaffold fasteners should be oiled. Bolts should be galvanized and rust proof. In the absence of galvanizing, it should be cleaned with kerosene and coated with engine oil after each use to prevent rusting.
Correlation News
2023-01-03